air conditioning engineering
Business scope: Planning and installation of industrial clean room decoration projects ranging from 100000 to 10 levels. Design and installation of cl
Product details
Step 1: Early Stage
Engineering consulting/functional design/preliminary design/engineering budget/improvement plan/implementation plan
Step 2: Planning
Process design/construction design/BIM design/BOM preparation/construction arrangement/construction plan
Step 3: Implementation
On site design/material procurement/production manufacturing/on-site construction/construction management/system debugging
Step 4: Run
Education and training/system archives/operation optimization/system maintenance/repair and maintenance/management optimization