Wuhan Huayi Electric Power Technology Co., Ltd
Home>Products>Secondary power testing equipment
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    158-2718-1508139-7166-7681
  • Address
    2nd Floor, Building 11, Gezhouba Sun City, No. 40 Gaoxin Fourth Road, Donghu Development Zone, Wuhan City
Contact Now
Secondary power testing equipment
Secondary power testing equipment that has obtained a license for secondary installation (repair, testing) of power facilities can engage in the insta
Product details

On December 1, 2017, the National Energy Administration made corresponding adjustments to the qualification equipment for power testing. The qualification equipment for testing in each province and region is the same, and some equipment that is not commonly used by power enterprises in actual work is omitted. Huatian Power briefly introduced the new version of the construction equipment selection guide for the second level power facility license for installation (repair, testing) testing.

Obtaining a second level installation (repair, testing) license, one can engage in the installation, maintenance, or testing activities of power facilities with voltage levels below 220 kV.

To learn about the application materials and filling specifications for the installation, maintenance, and testing of power facility licenses, you can click on "Application Specifications" to browse.

Product nickname: Secondary testing instrument, secondary testing equipment, testing instrument equipment, secondary testing configuration table, secondary testing equipment, and selection table for secondary testing and inspection equipment.

Configuration Table of Secondary Power Test EquipmentTechnical Parameter
Serial Number Name of machinery and equipment unit quantity specifications model
one High voltage generating equipment
1 DC high voltage generator cover 1 DC:250kV/5mA ZGS-250kV/5mA


2


Power frequency withstand voltage test device

cover 1 AC:10kVA/100kV GYD-10kVA/100kV
cover 1 AC:5kVA/50kV YDJ-5kVA/50kV
3 Complete set of equipment for frequency conversion series resonance test cover 1

2000kVA/500kV/5A, 30-300Hz

XZB-2000kVA/400kV
4 Induction voltage withstand test device cover 1 5kVA/360V 150Hz SFQ-5kVA/500V
two Electrical measuring instruments


1


High voltage dielectric loss tester


tower


2

1. The accuracy of medium measurement is 1%

2. The capacitance accuracy is 0.5%

3. Anti interference frequency conversion


JS-H

2 Loop resistance tester tower 2 DC:≥100A HLY-100A
3 Transformer volt ampere characteristic tester tower 1 2200V/5A FA-103
4 Ground Resistance Tester tower 1 Frequency difference method JD-H
5 Capacitance and inductance tester tower 1 RG-H
6 Grounding continuity tester tower 1 DC:1A DT-10A
7 Transformer DC resistance tester tower 2 DC:≥10A ZZC-10A
8 Transformer ratio tester tower 1 Digital 0.5 level BBC-H
9 Transformer winding deformation tester tower 1 Frequency response method RBX-H
10 Load tap changer tester tower 2 I≥1A BYKC-3000
11 Circuit breaker characteristic tester tower 2 GKC-H
12 Zinc oxide lightning arrester resistive current tester tower 1 BLC-H
13 Three phase relay protection tester tower 2 Two sets of three-phase voltage and current each HY331
14 Transmission line parameter tester tower 1 Frequency difference method XLY-Y
15 Lightning strike counter calibrator tower 1 FD-III
16 insulation resistance tester tower 2

DC: 0~10000V 200G (Ω), short-circuit current ≥ 5mA

GM-10kV
three Oil and gas experimental instruments
1 SF6 leak detector tower 1 Sensitivity 1ppmv XP-1A
2 SF6 gas micro water tester tower 1 WS-2
3 SF6 gas density calibrator tower 1

Accuracy level 0.2, pressure range 0~1.0Mpa

MD-H
4 Insulation oil chromatograph tower 1 YSP-H
5 Insulation oil closed flash point tester tower 1 YBS-H
6 Insulation oil micro water meter tower 1 PPM level YWS-H
7 Insulation oleic acid value tester tower 1 YSZ-H
8 Insulation oil tester tower 1
9 Automatic dielectric loss measuring instrument for insulating oil tower 1 YJS-H
10 Insulation oil dielectric strength tester tower 1 JYY-HI
four Common Instrument List
1 Megger only 2 DC:2500V DMG2671
2 Megger only 2 DC:500V DMG2670
3 Digital dual clamp phase voltmeter only 2 Measure current 1mA~5A SMG2000E

Note:1. The appearance of the product is subject to the actual product. Technical parameters and models are subject to change without prior notice. If there is any act of theft or copying, legal responsibility will be pursued
2. To learn more about Huayi products, please enter the product center. Service Hotline:

Characteristics and advantages of secondary power testing equipmentSelection Reference

Those who have obtained a second level installation (repair, testing) license for power facilities can undertake the installation of transmission, power supply, and power receiving facilities below 220 kV. The applicant for the second level installation (repair, testing) power facility license shall meet the following conditions:

(1) Having legal personality and a well-established organizational structure;

(2) The registered capital shall not be less than 20 million yuan, and the net assets shall be over 24 million yuan;

(3) Undertook 2 or more of the following projects within 5 years, with qualified engineering quality:

1. 400 kilometers of transmission lines above 220 kV or 500 kilometers of transmission lines above 110 kV;

2. Four substations with voltage levels above 220 kV or six substations with voltage levels above 110 kV;

3. 40 kilometers of cable lines above 220 kV or 80 kilometers of cable lines above 110 kV;

(4) The highest annual engineering settlement income within 3 years is over 60 million yuan;

(5) The technical leader has over 8 years of experience in power facility installation and management, and holds the professional technical qualification of senior engineer or above in the field of power engineering;

(6) Having no less than 120 professional technical personnel and economic management personnel, including no less than 70 engineering and technical personnel; Among engineering and technical personnel, there shall be no less than 30 personnel with intermediate or higher professional technical qualifications in the field of electric power;

(7) Having no less than 10 registered constructors with a second level or higher qualification in the field of electric power or project managers with a second level or higher qualification in the field of electric power;

(8) There shall be no less than 50 registered electricians holding a network operation certificate, including no less than 25 high-voltage electricians;

(9) There shall be no less than 4 budget officers, no less than 15 installation foremen, no less than 2 full-time quality inspectors, and no less than 2 construction contract administrators with the "Certificate of Professional Management Personnel for Construction Enterprises and Institutions";

(10) Having a dedicated safety management organization, with safety engineers holding professional technical qualifications at or above the level of electrical engineering engineer; There shall be no less than 2 full-time safety supervisors;

(11) Having construction machinery and quality inspection equipment that are suitable for the scope of the project that can be undertaken;

(12) Having a sound technical archive management system;

Atlas of secondary power testing equipment and instrumentsProduct Atlas

Product Attachment Diagram

  • 二级电力承试设备华意电力专业研发生产电力承装承试设备
    Huayi Electric Power specializes in the research and development of power installation and testing equipment
  • 二级电力承试设备华意电力专业研发生产电力承装承试设备
    Huayi Electric Power specializes in the research and development of power installation and testing equipment
  • 二级电力承试设备华意电力专业研发生产电力承装承试设备
    Huayi Electric Power specializes in the research and development of power installation and testing equipment
  • 二级电力承试设备华意电力专业研发生产电力承装承试设备
    Huayi Electric Power specializes in the research and development of power installation and testing equipment
Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!