[Technical Parameters]:
model | 300 type | 400 type | 500 type | 600 type | 800 type |
Production capacity (kg/h) | 50-200 | 150-400 | 300-500 | 500-800 | 800-1200 |
Finished product fineness (mesh) | 12-80 | 12-18 | 12-80 | 12-80 | 12-80 |
Motor power (kw) | 5.5 | 7.5 | 11 | 15 | 22 |
Adjustable speed (rpm) | 2800 | 2800 | 2400 | 2000 | 2000 |
Weight (kg) | 650 | 850 | 1200 | 1500 | 1800 |
Dimensions (length x width x height) (mm) | 5000×700×2700 | 6500×850×2700 | 7000×1000×3200 | 8500×1200×3500 | 9000×1500×3800 |
[Main purpose]:
This machine is designed and developed based on the principle of mixed powder spraying, and is widely used for material crushing in industries such as pharmaceuticals, food, and chemicals.
[Product Performance]:
★ Efficient and energy-saving, suitable for flow production with high output requirements. Easy to operate, easy to understand, and can be done manually.
★ It can be cooled by adding water to the jacket or by using a separate shaft for cooling.
★ Strong dust removal ability, with almost no dust in the production workshop.
[Scope of Application]:
★ Especially suitable for large-scale production with high demand for production capacity.
The WF platform plate universal crusher is a group of new 20B-60B continuous feeding crushers with cyclone separation that our company has independently researched and developed this year
★ It has many characteristics such as simple and compact structure, easy disassembly and cleaning, easy operation, low energy consumption, adjustable particle size of finished products (adjusted by sieve), machine cavity and bearing water cooling device, no overheating phenomenon, and wide practical range for materials.
The material is mainly made of stainless steel, carefully crafted, aesthetically pleasing, and meets the requirements of "GMP". This machine is capable of crushing heat sensitive materials.
After material crushing:
[Service Commitment]:
Design and production
Our company extensively solicits opinions from the demand side during the design and production stages of equipment processing, especially in the layout of flat and vertical surfaces, fully considering the site conditions and public engineering conditions of the demand side, so as to ensure the quality of the equipment while optimizing the combination.
Installation and commissioning
When the equipment arrives at the buyer's factory, our company will send dedicated technical personnel to guide the installation and be responsible for debugging to normal use.
training
Before the equipment is used normally by the demand side, our company's debugging personnel will organize training for relevant personnel of the demand side. The training content includes equipment maintenance, upkeep, timely repair of common faults, and operating procedures for the equipment.
quality assurance
Our company's equipment warranty period is one year. During the warranty period, if the equipment is damaged due to non-human factors, we are responsible for free maintenance. If the equipment is damaged due to human factors, our company will promptly repair it and charge a cost fee.
Maintenance and Deadline
Equipment damage that occurs upon expiration of the warranty period shall be repaired on site within two days by enterprises within the province and within four days by enterprises outside the province upon receiving notification from the purchaser. The services provided upon expiration of the warranty period are paid services, and a production fee shall be charged for each service.
Service Commitment
Our company promises to provide lifelong guidance, maintenance, and service for all equipment.
[Safety precautions for use]:
1. Before use, check whether all fasteners of the machine are tightened and whether the belt is tensioned.
2. The direction of spindle operation must conform to the arrow direction indicated on the protective cover, otherwise it will damage the machine and may cause personal injury.
3. Check if the electrical appliances are complete.
4. Check if there are any hard objects such as metal in the crushing room of the machine, otherwise it may damage the cutting tools and affect the operation of the machine.
5. Before crushing, the purity of the material must be checked, and no metal or hard impurities are allowed to mix in, in order to avoid damaging the cutting tool or causing accidents such as combustion.
6. The oil cup on the machine should be regularly filled with lubricating oil to ensure normal operation of the machine.
7. Stop adding materials before stopping the machine. If not in use, remove any remaining debris inside the machine.
8. Regularly check whether the cutting tools and mesh are damaged, and replace them immediately if they are damaged.
9. There may be slight vibrations during use, so be sure to tighten the handle connecting the hood to avoid accidents.