English

Shaanxi Mingrui Information Technology Co., Ltd
Home>Products>Project Information Management Platform (Bureau level)
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    18698551102
  • Address
    Room 10904, Unit 1, Building 1, No. 34 Fenghui South Road, High tech Zone, Xi'an City, Shaanxi Province
Contact Now
Project Information Management Platform (Bureau level)
1、 System Overview Project Information Management Platform (Bureau Level) (hereinafter referred to as the "Platform") uploads and displays data from v
Product details


1、 System Overview

The project information management platform (bureau level) (hereinafter referred to as the "platform") uploads and displays the data of each project department through the terminal on the display device, making it convenient for bureau level management personnel to view globally and access it in real time.

The platform is equipped with ultra high definition GIS image module, high-definition echo module, multi format and multi type image information hardware layer access module, and powerful image processing modules such as image stitching, roaming, stacking, segmentation, etc; It can be perfectly applied to various command, scheduling, monitoring integrated platforms, etc., creating an ultra high definition, cost-effective, and highly integrated integrated solution for various central level control platforms, which can meet the needs of large screen image and data display.

2、 Design principles

The design of the platform follows the overall design principles of "efficiency, stability, and ease of use".

项目信息化管理平台(局级)

3、 Design Basis

Code for Design of Communication Grounding in Industrial Enterprises GBJ115-87

Design Code for Electronic Computer Room GB50174-93

Procedures and Requirements for Security and Prevention Engineering GA/T75-1994

General graphic symbols for security and prevention systems GA/T74-1994

Computer Software Development Specification GB8566-88

Computer Software Unit Testing GB/T 15532-95

International Organization for Standardization (ISO) standards

4、 Technical architecture diagram

项目信息化管理平台(局级)

1. The platform is capable of exchanging, integrating, cleaning, and converting various types of data, storing and managing data systems for various business data, storing and managing unstructured data, and analyzing and utilizing data.

2. Utilize report tools, GIS platforms, and other application support software to achieve application support integration.

3. At the application layer, functional development is carried out using the J2EE three-layer BS framework and mature development platforms. Ultimately, the integration of interfaces, applications, and functions will be achieved through the monitoring center.

5、 System functions

Through the construction of the platform, promote the development of bureau level project management towards the direction of "standardization, efficiency, control, and transformation". Through the construction of data center system software, the following functional positioning can be achieved:

1 Project Overview

Display the distribution of all projects under the bureau/companies, and macroscopically showcase the overall operation of each company from different dimensions such as market operation, project scale, contract amount, contract nature, financial indicators, engineering category, project area, and output value.

2 Financial Dynamics

Enter data from the finance departments of various companies or bureaus for leaders at all levels to view the company's operational and financial status.

3 Progress management

Compare the annual and monthly planned output value with the actual output value of projects at all levels of units, and grasp the project progress from the perspective of project management data.

4 Quality Assurance

Statistical analysis of project quality from aspects such as engineering quantity, quality assessment, and quality inspection, as well as horizontal comparison of various subordinate units, can be used by the leadership to make decisions on management and supervision of each subordinate unit.

5 safety management

Summarize data on the inspection and management of hazardous engineering projects, and combine it with safety construction site assessment data and hidden danger investigation data from daily inspections to urge all units and project departments to strengthen project safety management. Reduce the total number of accidents, prevent major accidents, and eliminate major accidents.

6 Material Management

Extract data from the material system for summary analysis, displaying the production and usage of various materials, including raw materials, oil, concrete, steel bars, etc.

7 labor management

The leaders of the monitoring center can view the number of labor personnel employed by the project department under various levels of units, the age distribution, ethnic distribution, education status, and labor wages of the labor personnel.

6、 Software interface diagram


项目信息化管理平台(局级)


项目信息化管理平台(局级)


Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!