Wuhan Huayi Electric Power Technology Co., Ltd
Home>Products>Primary power testing equipment
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    158-2718-1508139-7166-7681
  • Address
    2nd Floor, Building 11, Gezhouba Sun City, No. 40 Gaoxin Fourth Road, Donghu Development Zone, Wuhan City
Contact Now
Primary power testing equipment
The license levels for the installation (repair, testing) of first level power testing equipment and power facilities are divided into first level, se
Product details

The license levels for installing (repairing, testing) power facilities are divided into Level 1, Level 2, Level 3, Level 4, and Level 5.

Those who have obtained a first level installation (repair, testing) license for power facilities can undertake the installation of all voltage level transmission, power supply, and power receiving facilities.

On December 1, 2017, the National Energy Administration made corresponding adjustments to the qualification equipment for power testing. The qualification equipment for testing in each province and region is the same, which eliminates the need for some power companies to carry out actual workFor equipment that is not commonly used in construction, Huatian Electric provides a brief introduction to the new version of the construction equipment selection guide required for the first level power facility license for installation (repair, testing).

Obtaining a first level installation (repair, testing) license allows one to engage in the installation, maintenance, or testing activities of all voltage level power facilities. To learn about the application materials and filling specifications for the installation, maintenance, and testing of power facility licenses, you can click on "Application Specifications" to browse.

Product nickname: Variable frequency resonance, Variable frequency series resonance, Series resonance, Series resonance transformer, Series resonance test equipment, Cable withstand voltage series resonance device, Series resonance withstand voltage equipment.

Configuration Table of Primary Power Test EquipmentTechnical Parameter
Serial Number Name of experimental equipment unit quantity specifications model
one High voltage generating equipment
1 DC high voltage generator cover 1
DC:300kV/5mA ZGS-300kV/5mA


2


Power frequency withstand voltage test device

cover 2 AC:10kVA/100kV GYD-10kVA/100kV
cover 1 AC:5kVA/50kV YDJ-5kVA/50kV
3 Complete set of equipment for frequency conversion series resonance test cover 1 4000kVA/800kV/5A/30~300Hz XZB-4000kVA/800kV
4 Partial discharge complete equipment cover 1

Above 400kWPower supply with frequency greater than 100Hz

HYJF-2000
5 Induction voltage withstand test device cover 1 5kVA/360V 150Hz SFQ-5kVA/500V
two Electrical measuring instruments


1


High voltage dielectric loss tester


tower


2

1. The accuracy of medium measurement is 1%

2. The capacitance accuracy is 0.5%

3. Anti interference frequency conversion


JS-H

2 Loop resistance tester tower 2 tower HLY-100A


3


Transformer volt ampere characteristic tester

tower 1 2200V/1A FA-103
tower 1 1100V/5A FA-103


4


Ground Resistance Tester

tower 1 Communication method>3-20A
tower 1 Frequency difference method JD-H-5A
5 Capacitance and inductance tester tower 1
RG-H
6 Precision current transformer tower
2 Level 0.2
7 Precision Voltage Transformer tower 2 Level 0.2
8 Grounding continuity tester tower 1 DC:1A DT-10A
9 Transformer DC resistance tester tower 2 DC:≥10A ZZC-10A
10 Transformer ratio tester tower 1 Digital 0.5 level BBC-H
11 Transformer winding deformation tester tower 1 Frequency response method RBX-H
12 Load tap changer tester tower 1 I≥1A BYKC-3000
13 Circuit breaker characteristic tester tower 2
GKC-H
14 Zinc oxide lightning arrester resistive current tester tower 1
BLC-H
15 Three phase relay protection tester tower 1 Two sets of three-phase voltage and current each HY661
16 Transmission line parameter tester tower 1 Frequency difference method XLY-Y
17 Complete set of high current experimental equipment tower 1
SLQ
18 Online current detection ammeter calibrator
tower 1

19 Lightning strike counter calibrator tower 1
FD-III


20


insulation resistance tester

tower 2

DC:0~10000V 200G(Ω)


Short circuit current ≥ 5mA


GM-10kV

21 Transmitter calibrator tower 2

22 Gas relay calibration device tower 1

three Oil and gas experimental instruments
1 SF6 leak detector tower 1 Sensitivity 1ppmv XP-1A
2 SF6 gas micro water tester tower 1
WS-2

3

SF6 gas density calibrator

tower 1

Accuracy level 0.2Pressure range 0~1.0Mpa

MD-H
4 Insulation oil particle size tester tower 1

5 Insulation oil chromatograph tower 1
YSP-H
6 Insulation oil closed flash point tester tower 1
YBS-H
7 Insulation oil micro water meter tower 1 PPM level YWS-H
8 Insulation oleic acid value tester tower 1
YSZ-H
9 Insulation oil pH tester tower 1

10 Automatic dielectric loss measuring instrument for insulating oil tower 1
YJS-H
11 Insulation oil dielectric strength tester tower 1
JYY-HI
four Common Instrument List
1 Megger only 2 DC:5000V DMG2672
2 Megger only 2 DC:2500V DMG2671
3 Megger only 2 DC:500V DMG2670
4 WYK cover 1 220V/110V/5A
5 Current Transformer Secondary Circuit Load Tester tower 1 20V/5A YJFH-H
6 three-phase voltage regulator tower 1 15kVA
7 Digital dual clamp phase voltmeter only 2 Measure current 1mA~5A SMG2000B

Note:1. The appearance of the product is subject to the actual product. Technical parameters and models are subject to change without prior notice. If there is any act of theft or copying, legal responsibility will be pursued
2. To learn more about Huayi products, please enter the product center. Service Hotline:

Characteristics and advantages of primary power testing equipmentSelection Reference

Those who have obtained a first level testing license for the installation (repair, testing) of power facilities can engage in testing activities for all voltage levels of power facilities. The applicant shall meet the following conditions:

1. Having legal personality and a well-established organizational structure;

2. The registered capital shall not be less than 40 million yuan, and the net assets shall be over 48 million yuan;

3. Within 5 years, have undertaken 2 or more of the following projects with qualified engineering quality: 300 kilometers of transmission lines with a voltage of over 330 kV or 500 kilometers of transmission lines with a voltage of over 220 kV, 2 substations with a voltage level of over 330 kV or 5 substations with a voltage level of over 220 kV, 80 kilometers of cable lines with a voltage of over 220 kV, or 1 crossing project with a tower elevation of over 100 meters;

Engaged in power facility installation business with the highest annual engineering settlement income of over 100 million yuan within 3 years;

4. The technical leader has more than 10 years of experience in power facility installation and management, and holds the professional technical qualification of senior engineer or above in the field of power engineering;

5. Having no less than 160 professional technical personnel and economic management personnel, including no less than 100 engineering and technical personnel; Among engineering and technical personnel, there shall be no less than 60 personnel with intermediate or above professional technical qualifications in the field of electric power, and no less than 15 first level registered constructors or project managers with first level qualifications in the field of electric power;

6. There shall be no less than 60 registered electricians holding a network operation certificate, including no less than 30 high-voltage electricians;

7. There shall be no less than 5 budget officers, no less than 20 installation foremen, no less than 3 full-time quality inspectors, and no less than 3 construction contract administrators with the "Certificate of Professional Management Personnel for Construction Enterprises and Institutions";

8. Having a dedicated safety management organization and a sound safety management system, safety engineers have professional technical qualifications above electrical engineering, and no less than 3 full-time safety supervision personnel;

9. Having construction machinery and quality inspection equipment that are suitable for the scope of the project that can be undertaken;

10. Having a sound technical archive management system;

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!