Plastic surgery hospital sewage treatment equipmentSolution to pipeline blockage:
1. Prefabricate pipelines based on user requirements and the environmental characteristics of the construction site. Before use, check the pipe standards, quantities, markings, and quality according to the planning requirements.
2. The team work for pipeline prefabrication needs to be carried out on steel channels for pipeline processing, while stainless steel pipelines should be carried out on wooden channels.
3. The prefabrication of pipelines should consider in advance whether it is convenient for transportation and installation, leaving adjustment openings. After the prefabrication is completed, the interior of the pipeline should be cleaned and the gate should be closed.
4. Steel pipe cutting requires a flat surface, free of cracks, burrs, bumps, and other defects. The cut steel pipe should be promptly marked with the raw material standards and the orientation used on each section of the pipe.
5. After the pipe rack is made, it should be promptly treated with rust prevention and marked properly.
