Changzhou Liansheng Drying Equipment Co., Ltd
Home>Products>Medicinal high-purity nitrogen generator
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    1380150301113915088178
  • Address
    No. 78 Changzheng Road, Zhenglu Town, Changzhou City, Jiangsu Province
Contact Now
Medicinal high-purity nitrogen generator
Technical parameter table Model HF-3HF-5HF-10HF-20 Nitrogen production rate 3m/h
Product details
Technical parameter table
model
HF-3
HF-5
HF-10
HF-20
Nitrogen production rate
3m³/h
5m³/h
10m³/h
20m³/h
Nitrogen purity
≥99.999%
≥99.999%
≥99.999%
≥99.999%
Nitrogen outlet pressure
0.2-0.55Mpa(gauge pressure)
0.2-0.55Mpa(gauge pressure)
0.2-0.55Mpa(gauge pressure)
0.2-0.55Mpa(gauge pressure)
Installed power
(Excluding air compressor)
0.6KW
0.7KW
0.8KW
1.0KW
power supply
220V/50HZ
220V/50HZ
220V/50HZ
220V/50HZ
HF-100 HF-200 HF-300 HF-400 HF-500 HF-600 HF-800 HF-1000
Nitrogen standard(Based on customer requirements, this table is for reference only)
number
Test project
standard(China)(Pure nitrogen)
Standard(USP32
Standard(EP60
notes
1
odor
No special odor
No special odor
No special odor
laws and regulationsGBT8979—2008
Technical indicators for pure nitrogen, high-purity nitrogen, and ultra pure nitrogen
pharmacopoeiaUSP32
pharmacopoeiaEP60
GMP
Implementation Guidelines
Guidelines for Drug Production Validation
2
Moisture testing (related to dew point temperature)
≤15.0×10-6
——
≤67ppm
3
Nitrogen purity
Meet the process requirements99.99
≥99.0
≥99.5
4
Dust particle testing
——
——
——
5
Aseptic experiment
1CFU/m3
——
——
6
oxygen
≤50.0×10-6
≤1×10-2
≤50ppm
7
hydrogen
≤15.0×10-6
——
——
8
carbon monoxide
≤5.0×10-6
≤1.0×10-5
≤5ppm
9
carbon dioxide
≤10.0×10-6
——
≤300ppm
10
methane
≤5.0×10-6
——
——
11
Reference basis
laws and regulationsGBT8979—2008
Technical indicators for pure nitrogen, high-purity nitrogen, and ultra pure nitrogen
GMP
Implementation Guidelines
Guidelines for Drug Production Validation
pharmacopoeiaUSP32
pharmacopoeiaEP60
after-sale service
Upon receiving customer debugging information during the debugging phase, and if the customer meets the debugging conditions, they must arrive on site within 48 hours. Regular follow-up visits are conducted to address any potential issues that may arise during equipment operation, eliminate potential faults, and maintain the unit in good working condition.
Free training for the buyer's personnel (including training at the manufacturing plant and installation site), the training content mainly includes the working principles, architecture, process flow, operating procedures, daily maintenance and management of the entire device and system, system fault analysis and resolution, etc.
Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!