Shandong Dexin Sewage Treatment Equipment Manufacturer
Home>Products>Large scale low-temperature sludge dewatering machine
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    13361442845
  • Address
    Weifang City, Shandong Province
Contact Now
Large scale low-temperature sludge dewatering machine
The power supply is not connected to the universal key switch. Turn on the power or close the switch inside the distribution cabinet;
Product details

Large scale low-temperature sludge dewatering machineCommon troubleshooting solutions:
1. The main power supply is not connected. Check the external power supply and resend the power;
2. Control the power supply without connecting the universal key switch to turn on the power or close the switch inside the distribution cabinet;

大型污泥低温脱水机

3. Press the pause button again to make it pop up;
4. Press and release the emergency stop button;

大型污泥低温脱水机

5. PLC damage replacement;
6. Reconnect the power cord to an independent power source for other devices.

(This content is provided by www.wushuichuli1.com)
Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!