Jingjiang Dema Crane Equipment Co., Ltd
Home>Products>LHY type - Metallurgical electric hoist bridge crane=Metallurgical crane/Casting crane
LHY type - Metallurgical electric hoist bridge crane=Metallurgical crane/Casting crane
LHY type - Metallurgical electric hoist bridge crane=Metallurgical crane/Casting crane
Product details

LHY type - electric hoist bridge crane, overhead crane, traveling crane (referred to as metallurgical hoist double) is a fixed steel wire rope hoist as the lifting mechanism, installed on a centrally driven double track trolley, and used in conjunction with a double beam bridge Mainly used in mechanical manufacturing workshops, warehouses, material yards, hydropower station maintenance, assembly and other places.
This series of products has two forms of control: cab control and ground control.

1. The main beam features have been upgraded from a regular A3 double beam crane to an A6 level, with the working level increased by 2 levels. The working system is higher, the main beam strength is greater, and a thermal insulation protective layer is added at the bottom of the crane, filled with thermal insulation asbestos. To prevent high-temperature molten metal from roasting the crane and prevent deformation of the crane main beam,

2. Institutional section: All operating mechanisms have increased their protection level. Due to the rise in ambient temperature, the protection level of all operating motors has been increased to H-level insulation., Metallurgical special hook, high temperature resistant steel core wire rope, metallurgical electric hoist, hard toothed reducer, electric hoist with dual braking unit added.

3. Electrical part: Add high-temperature resistant cables, and increase the protection level of the electrical control part.

Name Title Unit Unit Specification specifications
Rated lifting capacity load: Gn 5T,10T,16T,20T,32T,50t
Span: S 7.5m-30m
Lifting Height: H 6m-22m
Working power source 3p A.C 50HZ 380V
Job Level Class: jc A6 JC=40%

Note: Gn=rated lifting tonnage S=span (distance from the center of the left track to the center of the right track) H=lifting height (distance from the ground to the highest point of the hook)

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!