How to install QJB submersible mixer?
How to install QJB submersible mixer?
Product details

    How to install QJB submersible mixer?

    In your installationagitatorsPreviously, you need to understand the following inspection items.

    Firstly, check whether the actual usage conditions are consistent with the specified usage conditions, and verify whether the pool depth and foundation conditions meet the requirements.

    Secondly, there should be a dedicated person responsible for unpacking the equipment. After unpacking, the equipment components should be checked for completeness and damage according to the packing list. If necessary, perform maintenance, cleaning, and oiling, then arrange neatly and cover with oilcloth or plastic cloth.

    Thirdly, it should be done by a qualified electrician0-500V megohmmeter, check the three power core wires of the motor cable. It is strictly prohibited to use a megohmmeter to check the control core wire to avoid damaging the electrical components inside the mixer.

    Fourthly, the voltage must be checked based on the rated voltage indicated on the nameplateWithin a range of ± 5%. If the power supply is far away from the mixer, line loss should be considered, the cross-sectional area of the cable should be increased, the number of joints should be minimized, and the joints should be sealed to prevent water leakage. In addition, considering the convenience of maintenance and repair, it is recommended to set up a terminal box next to the machine.

    Fifth, the submersible mixer is equipped with a dedicated control cabinet. Before use, carefully read its instructions, check whether the equipment wiring is correct, whether the starting device is flexible, whether the contact is good, whether the metal shell of the starting equipment is reliably grounded, check whether all wiring points are loose, and re tighten them one by one.

    Sixth, the power core wire, grounding wire, and control core wire on the submersible mixer should be connected to the wiring head of the control box one by one. To ensure safety, it is necessary to connect securely.

    After the inspection is completed, you can proceed with the installation according to the requirementsagitatorsInstall and use the equipment.


    Knowledge related to installation system of submersible mixer

    aboutagitatorsWe have learned about the installation types in our previous article, and there are a total of four types.I, II, III, IV. The differences between these four installation types are mainly distinguished based on the structural characteristics, weight, and usage conditions of the mixer host.

    Among these four installation types, there are some knowledge points that we need to understand before installation.

    1. The specialized installation system for submersible mixers can quickly install and disassemble the mixer without the need to discharge sewage from the pool.

    2. The installation system I is only suitable for pool depths ≤ 3m. The models are QJB0.85/8 and QJB1.5/6, which can adjust the angle in both horizontal and vertical directions.

    3. Installation II III, The guide rod can rotate horizontally around the Z-axis, with a maximum angle of ± 60 °.

    4. When H>5m, a support frame should be added between the installation system II and III guide rods.

    5. The support frame and lower bracket are fixed to the pool wall and bottom with expansion bolts or chemical anchor bolts. Recommend installing embedded parts.

    6. The installation system material is available in two options: stainless steel and carbon steel anti-corrosion.

    7. Multiple mixers can share a mobile lifting system.

    It should be noted that when you place an order, selectagitatorsBefore selecting the model, it is recommended that you provide the supplier with the depth and type diagram of the pool on site, so that the supplier can help you determine the correct model and more accurately determine the size of the guide rod and the number of support frames when designing the submersible mixer.


    Nanjing Du'an Water Treatment Service Commitment:

    (1) Free dispatch of technical personnel to user units (or design departments) for technical briefing.

    (2) Provide accurate equipment outline drawings, installation drawings, and embedded part drawings for free.

    (3) Timely dispatch after-sales service personnel to the construction site for equipment installation or guidance on installation and commissioning work.

    (4) Free on-site technical training for user operation and maintenance personnel.

    (5) During the equipment warranty period, we will provide users with free consumable parts. For customers with technical difficulties, we can send personnel to replace them.

    (6) Immediately respond to user notifications and arrive on-site within 24 hours within the province; Arrive at the scene within 48-72 hours outside the province.

    (7) Provide lifelong product service.