Suzhou Jiajun Packaging Machinery Co., Ltd
Home>Products>Fully automatic combination packing machine
Product Groups
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
  • Address
    No. 26 Chengyang Road, Xiangcheng District, Suzhou
Contact Now
Fully automatic combination packing machine
The automatic packing machine is a packing equipment that automatically shapes and arranges packaging materials, loads them into open cardboard boxes,
Product details


Product Technical Parameters

Packing method: Side push type
Production efficiency: 6-8 boxes/minute
Overall power: 2.0KW
Power supply voltage: 380VAC/50HZ
Work noise: < 80 decibels (DB)
Gas source pressure: 0.5-0.8Mpa

Product Introduction

automaticcase packerThe packaging equipment is capable of automatically shaping and arranging packaging materials, loading them into open cardboard boxes, and completing actions such as tape sealing. All actions are fully automated. This machine adopts a new combination structure, including functional units such as box packing device, column packing device, filling device, and sealing device, which respectively complete corresponding functional actions. Each device is installed on the same main frame. The box blank rack of the box forming device is located above, the filling device is located directly below the box forming device, the entire row of devices is in front of the filling device, and the sealing device is located behind the filling device. Adopting P L. C+Touch screen control. Greatly convenient to operate, manage, and reduce production personnel and labor intensity, it is an essential equipment for automated large-scale production

conceptual drawing

application area

It is developed for mineral water, fruit juice, beverage, Baijiu, beer, infusion bottles and other products, with strong specificity, stable performance, and tight and beautiful products after packaging.

after-sale service

Service CommitmentService Promise
All products sold by Jiajun Packaging are genuine. If you have any questions, please contact our customer service personnel and we will communicate with you as soon as possible to handle them. We will strive to meet your major needs with low prices and excellent services.
Delivery, installation and commissioning periodDelivery, installation and commissioning stage
Assign dedicated after-sales service personnel for free to arrive on-site and guide customers in installation and debugging.
Warranty periodWarranty period
One year. Calculated from the date of self acceptance; During the warranty period, we are responsible for free replacement of all parts caused by quality or non natural wear and tear; All repairs during the warranty period, including those caused by natural wear and quality issues, are free of labor costs.
transportTransport
The transportation of goods and transportation safety shall be the responsibility of Party B, and the total contract price already includes the transportation insurance premium.
packagePacking
Whole vehicle shipment, wooden pallets, wrapped film packaging.
Unloading and handlingThe unloading and handling
The second party is responsible for unloading, and the first party arranges personnel and forklifts to assist in unloading.
Installation and commissioningInstallation and commissioning
1. The second party shall notify the first party in writing of the delivery date, expected arrival date, and preparations required by the first party before the equipment is shipped.
2. The installation personnel of Party B shall follow the equipment to the installation site of Party A for guidance on unloading, free equipment installation and commissioning, and training for Party A's operators.
3. The first party shall provide assistance to the second party for installation and debugging under existing conditions. The first party shall provide auxiliary tools to assist in installation and provide general tools.
4. The installation personnel of Party B shall strictly comply with the relevant regulations of Party A's factory during the installation period. If overtime is required, written consent from Party A shall be obtained.


Training and after-sales serviceTraining and after sale service
1) The second party is responsible for the installation and debugging of the equipment, and provides training on operation and maintenance to the first party's operation and management personnel, ensuring that the first party's operators can independently and proficiently operate and maintain the equipment.
2) The first party purchases spare parts from the second party, and the second party arranges technical services when needed. The second party shall respond to the first party's request for service by phone or fax within 2 hours and dispatch qualified service personnel to the first party's equipment usage site within 96 hours.

technical standardTechnical standard
1. Party B guarantees that the raw materials of the equipment specified in this contract comply with national standards, and guarantees quality and compliance with the process standards and parameters specified in the technical agreement. Party B shall provide a quality assurance certificate.
2. The equipment of Party B shall be strictly manufactured in accordance with the requirements stipulated in the technical agreement signed by both parties. If any party needs to make any changes, they must obtain the consent of the other party and provide a written form, with both parties signing and confirming.
3. Product manufacturing and installation standards: see technical agreement

TipsReminder
Due to frequent packaging changes of some products, the goods you receive may not be completely consistent with the pictures. Please refer to the actual product you receive, and we will try our best to update it in a timely manner. We apologize for any inconvenience caused and thank you!

packing list

Random accessories: 1 toolbox, 1 manual, 1 certificate of conformity, 1 large adjustable wrench, 1 open-end wrench 8-10/13-15, 17 each, 1 set of hexagonal wrenches, 1 main tension spring, 2 cutter tension springs, 2 cutter cover springs (angle edge machines KBG-50 and KBH-50 are not used), 1 fuse each (according to the actual installation on the equipment), and 1 photoelectric screwdriver.

Jiajun Advantage


About Jiajun

Jiajun Packaging Company was established in 1998. After more than 10 years of development, it has become a large-scale and strong enterprise in East China. The company has continuously shifted from a sales oriented enterprise to a production and sales oriented enterprise. The company has its own brand "Jiajun" and passed the international quality system ISO9001 certification in March 2005. The company specializes in packaging machinery and materials, and adheres to the business philosophy of integrity management and customer first



Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!