Hefei Dewey Intelligent Technology Co., Ltd
Home>Products>DWSY315 single-phase cost control guide rail table
DWSY315 single-phase cost control guide rail table
The DWSY315 single-phase remote cost control rail meter is a single-phase electronic energy meter with NB-IOT interface function. It establishes long-
Product details
Technical Parameter

1product overview

The DWSY315 single-phase remote cost control rail meter is a single-phase electronic energy meter with NB-IOT interface function. It establishes long-distance power parameter collection through the NB-IOT data network, and users can display relevant parameters in the meter through a computer. It has the function of collecting measurement data and controlling on/off according to instructions, and can separately implement measurement and control of electric energy measurement modules. All parameters and performance indicators fully comply with the technical requirements of GB/T17215-2002 "Level 1 and Level 2 Static AC Active Energy Meters" and DL/T645-1997 "Communication Protocol for Multi functional Energy Meters". This product has advanced design, reasonable structure, stable and reliable operation, and strong anti-interference ability.

2、 Main functions and features

Implement branch metering and branch control with an accuracy of 1.0 level

High brightness LCD display, total power, remaining power, and used power

Functions such as increasing power consumption, purchasing power, refunding power, automatic power-off, timed power on, load control, data retention, etc

Rail type, small size, high precision, low power consumption, wide load capacity, easy installation

The latest products manufactured using advanced solid-state integration technology and SMT process

Before leaving the factory, the meter number (communication address), bureau number, programming password, starting power consumption, etc. can be set according to user requirements

Equipped with power failure detection and watchdog circuit, ensuring reliable operation of the system

3、 Technical parameters

Accuracy level: 1.0

Rated voltage: 220V

Calibration current: 10 (60) A

Meter constant: 1600

Basic error:

image.png

Working voltage: 80% to 120% Ub

Starting current:< 0.4%Ib

Voltage circuit:< 5VA

Current circuit: less than 1VA

Ultimate withstand voltage: 1.9Ub for 4 hours

Stealth: equipped with logic anti creep circuit

Data retention time after power outage: greater than or equal to 10 years

Mean Time Between Failures (MTBF): greater than 80000 hours

4、 Installation and wiring

1. Before installing and using a new module, the appearance, labeling, and especially the surface ID and address codes should be checked and recorded.

2. The module should be installed inside or outside a waterproof meter box, which should be fixed on a sturdy and fire-resistant wall. It is recommended to install it at a height of no less than 2 meters. There are no corrosive gases in the air.

3. The module should be wired according to the wiring diagram on the terminal cover, preferably using copper wire or copper wire connectors, and all wiring screws should be tightened.

5、 Outline dimension diagram


image.png

6、 Transportation and storage

1. The transportation and unpacking of modules should not be subjected to severe impacts, and should be transported and stored according to the specifications of GB/T13384-2008 "General Technical Conditions for Packaging of Mechanical and Electrical Products", and placed according to the "upward" requirements on the packaging box;

2. The storage environment should be between -25 ℃ and+70 ℃, with a relative humidity not exceeding 95%. There should be no corrosive gases in the air and it should be moisture-proof.

3. Modules should be stored in the warehouse and placed on shelves with a stacking height of no more than 10 boxes. After unpacking, the stacking height of a single module should not exceed 10 boxes.

7Warranty


Before the module leaves the factory, if the user complies with the requirements specified in the manual and the lead seal is intact at the manufacturing plant, or if it is found that the energy meter does not meet the specified requirements, the manufacturing plant provides a 2-year "three guarantee" service.


Model List
download
Application Manual
  • DWSY315 Single phase Cost Control Guide Table User Manual. pdf
Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!