Shandong Chuangxin Huayi Environmental Engineering Co., Ltd
Home>Products>Community sewage treatment equipment
Community sewage treatment equipment
6 fully automatic control, no need for professional personnel management;
Product details


1、 Community sewage treatment equipmentProcess characteristics:
1. The community sewage treatment equipment is buried below the surface, and the surface above the equipment can be used for greening or other purposes without the need for building houses, heating, or insulation. Processing equipment is generally made of carbon steel and fiberglass, and undergoes anti-corrosion treatment.
2. The biological treatment process adopts microbial treatment process, which includes regulating tank, anaerobic digestion tank, contact oxidation tank, filtration tank, and disinfection. The activated sludge tank has a small volume, strong adaptability to water quality, good shock load resistance, stable effluent quality, and will not produce sludge expansion. A new type of elastic three-dimensional packing is used in the pool, which has a large specific surface area and is easy to maintain and detach. Under the same organic load conditions, it has a high removal rate of organic matter and can improve the solubility of oxygen in the air in water
3. Using biological contact oxidation, the volume load of the filler is relatively low, and microorganisms are in their own oxidation stage, resulting in low sludge production
4. The underwater aeration equipment used in this device meets the requirements of quiet residential areas and has little impact on the surrounding environment.
5. The community's domestic sewage treatment equipment adopts conventional exhaust.
6. The entire equipment processing system is equipped with a fully automatic electrical control system, which operates safely and reliably. Generally, there is no need for dedicated personnel to manage itIt is necessary to maintain and upkeep the equipment in a timely manner.
2、 Community sewage treatment equipmentFeatures:
1. Integrated manufacturing, high intensity, compact structure, small footprint
2. Incremental expansion is convenient, easy to operate and maintain, and can be moved anytime and anywhere. This device can be directly transported to the processing target location for processing without the need for secondary construction;
3. Resistant to impact loads, high pollutant removal rate, stable and reliable effluent quality, and low operation and maintenance costs;
4. Has minimal impact on the surrounding environment, low sludge production, and noise levels below the standards of Class II areas;
5. Adopting a unique structure to minimize the spread of odors to the greatest extent possible;

6 fully automatic control, no need for professional personnel management;






3、 Main parameters of community sewage treatment equipment:

Project \ \ Model
CXWSZ-1
CXWSZ-3
CXWSZ-5
CXWSZ-7.5
CXWSZ-10
CXWSZ-15
CXWSZ-20
CXWSZ-30
CXWSZ-40
CXWSZ-50
Processing capacity m3/h
1
3
5
7.5
10
15
20
30
40
50
Number of devices
1
1
1
1
2
2
2
3
4
4
Sludge adsorption and primary sedimentation tank
1.8
5.5
9
14
18
27
36
50
82
100
Contact oxidation tank (m3)
5.0
14.5
24
36
44
63
83
130
170
200
Surface load of secondary sedimentation tank
(m3/m2h)
1.2
1.3
1.3
1.3
1.2
1.2
1.5
1.5
1.5
1.6
Disinfection pool (m3)
0.6
1.8
2.8
4
5.5
8
10
15
20
25
fan
model
HC-25IS
HC-30IS
HC-50C
HC-50IS
HC-60IS
HC-80S
HC-100S
HC1-100S
HC-100S
HC-100S
Power (kw)
0.4
0.75
1.5
2.2
2.2
3.7
5.5
5.5
5.5×2
5.5×2
number of units
2
2
2
2
2
2
2
2
3
3
water pump
model
AS10-2CB
AS16-2CB
AS30-2CB
Power (kw)
1.0
1.6
2.9
Large item weight (t)
5
6
7
10
8
10
10.5
10.5
10.5
12
Total weight of equipment (t)
5.5
6.5
8
11
17
20
21
29
38
42
Floor Area (m)2)
6
14
20
30
50
65
75
115
155
185

Note: The above parameters and equipment dimensions are for reference only. Please refer to our company's actual parameters and drawing dimensions during design!

4、 After sales Service Commitment (Hotline: 0536-6438321)

1. Strictly follow the requirements of the demand side, ensure progress, and ensure quality to complete the project.

2. All materials and overall projects provided by us are covered by a 12-month free warranty period, which starts from the date of final completion and acceptance of the overall project.

3. For any project within our contracting scope and content, we will respond within 4 hours of receiving the repair notice and must send someone to repair it within 48 hours.

4. We promise to be responsible for the quality of the project for life. We will provide spare parts at preferential prices for a long time, and store the main components, spare parts, vulnerable parts, etc. with patent rights, independently produced and sold as spare parts at the buyer's site.

5. We promise to provide lifelong maintenance and repair services for this project at a discounted price (cost price), and specifically specify this fee standard in the handling plan as the basis for future contracts to ensure the normal use of this project.

6. If we fail to provide specific and detailed service fee standards as requested by the demander, the demander may determine all service fee standards that we should provide based on the service fee standards provided by other suppliers in this project or based on the cost price confirmed by the demander's audit department, and the principle of 'low or high'.








Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!