Shenzhen Zhiyuan Optical Communication Technology Co., Ltd
Home>Products>What three-phase cost control meter is better? High quality three-phase cost control intelligent energy meter with intelligent source light
Product Groups
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    18588678461
  • Address
    702 R&D Building, Hongfa High tech Park, Tangtou, Shiyan Town, Bao'an District, Shenzhen
Contact Now
What three-phase cost control meter is better? High quality three-phase cost control intelligent energy meter with intelligent source light
What three-phase cost control meter is better? High quality three-phase cost control intelligent energy meter with intelligent source light
Product details
Instruction manual (click to download)

DTZY1823/DSZY1823 three-phase electronic cost controlled energy meterAdopting the most advanced technologies such as dedicated integrated circuits for electric energy meters, non-volatile memory for permanent information storage, infrared communication, and Chinese character large screen LCD display. This meter integrates numerous functions, including active and reactive bidirectional time-sharing energy measurement, phase wise bidirectional measurement, demand measurement, power factor measurement, display and remote transmission of real-time voltage, current, power, etc. It also enables users to prepay and flexibly preset multiple functions. Overload alarm and automatic power-off, phase loss alarm, phase loss situation recording, automatic meter reading, etc. Using handheld computers as a medium to achieve information transmission between users and power supply department computers. And various software and hardware anti-interference measures are adopted to ensure the reliable operation of the electricity meter, thus adapting to the effective and timely modern scientific management needs of the power department for users.

Support prepaid services, add communication modules, and enable remote opening and closing of switches.

frequently asked questions

1. Is your electricity meter accurate in measurement?

Our electricity meter production strictly follows the technical standards of State Grid and Southern Power Grid. Meet DL/T645-2007; GB/T17215.321-2008; GB/T17215.323-2008 and other communication protocols. And pass the actual testing by the nationally recognized testing center. High standards, strict requirements, and standardized production, please rest assured.

Do we need to buy a server for the remote meter reading system?

You can choose according to the actual situation. If the data volume is not particularly large and the management conditions are not met, you can choose not to purchase it and directly use the Alibaba Cloud cloud cloud platform server provided by our company. Compared to purchasing servers personally, it saves a lot of costs, and there is also a dedicated person responsible for online data maintenance.

How to upload data to the server? Do you need data usage fees?

The electricity meter data is uploaded to the Alibaba Cloud server through the concentrator, and the communication method to be used is determined according to the actual situation. If Ethernet is used, the existing network resources can be used. If using 4G module mode, the data data data fee package only costs a few tens of yuan per year.

4. I have very few electricity meters installed in a large factory area, so I don't want data to be connected to the internet. Can I use local software? Do you still need data usage fees?

No need, for situations where the number of electricity meters is small, the installation is scattered, and the distance is not far (within a line of sight of 2Km), we can use a meter reading solution that matches the gateway with a built-in wireless module meter or wireless collector. The software only needs to be installed on the meter reading computer. As long as the meter reading machine is turned on, it will cycle through the meter reading without the need for internet or data usage.

How do we collect electricity bills? If mobile payment is used, who will the tenant pay directly to?

There are two charging schemes. The first is manual charging, where the user hands over the money to the toll collector, who inputs the amount into the computer system to complete the payment process. The system will print documents and classify the accounts.

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!