Shanghai Zhongrong Yidian Co., Ltd
Home>Products>Three phase energy meter calibration device (isolated type)
Three phase energy meter calibration device (isolated type)
Three phase energy meter calibration device (isolated type)
Product details



Device level
0.05/0.1 level;

Device structure
Integrated or split type;

Table number
3 epitopes, 6 epitopes, 8 epitopes, 12 epitopes, 16 epitopes, 24 epitopes;

Main features
1. The complete set of equipment consists of a three-phase programmable power source (linear source), a three-phase multifunctional standard energy meter, an error calculator (embedded), a pulse and photoelectric signal receiving and processing system, a multi winding isolation PT, a multi meter position testing rack (hanging meter rack), a time base frequency meter, a 485 communication interface (embedded), device control software, a computer and peripherals (printer, barcode scanner, etc.)
2. The device has two structures: integrated and split. All adopt high-quality specialized aluminum magnesium alloy profile structure, which is lightweight, firm, beautiful and durable; The calibration workstation can meet the requirements of the national verification regulations from 3 to 24 positions (the standard types of calibration workstations include: 3 positions, 6 positions, 8 positions, 12 positions, 16 positions, and 24 positions)
3. Each meter of the device is equipped with an isolation current transformer (ICT), which can achieve non decoupling calibration (parallel calibration) of the energy meter and can be easily withdrawn or switched in for parallel calibration;
4. The device operation software can be customized by module according to user requirements and habits. The software is easy to operate and can preset calibration schemes for electric energy meters (including basic error measurement, creep and start-up tests, positive and negative active and reactive energy errors, as well as standard deviation testing, 24-hour variation testing, etc.) and influence quantity testing schemes. The electric energy meter can be fully automatically calibrated according to the selected calibration scheme. The calibration results can be stored, queried, and printed in various ways at any time for measurement data. And network management can be implemented according to user requirements;
5. Function of electric energy meter influence test: PC verification can set the influence test plan according to the requirements of the regulations, and complete tests on frequency influence, voltage influence, short-term voltage interruption influence, and gradual voltage change influence. And it can conduct harmonic impact tests. The PC verification can set the harmonic impact test plan according to the regulations. The voltage and current can output 2-21 standard harmonics separately or simultaneously, odd harmonics, even harmonics, sub harmonics, and harmonic components can be set;
6. The device can also perform multi constant verification and constant verification: PC verification can simultaneously verify multiple energy meters with the same current, voltage, and wiring method, but different constants and levels, and verify the constant rows of the energy meters. In the scheme setting, after setting the number of verification cycles for the first table, the remaining tables will automatically adjust according to a constant and ensure consistency in verification time;
7. The device also has the function of testing the indication error of the electric energy meter and the combination error of the meter;
8. The device has the ability to detect the time function of the electric energy meter, which can detect the daily timing error, time period switching error, demand cycle error, demand indication error, and combination error of the multifunctional electric energy meter

9. The device has the ability to detect the communication function of the multifunctional energy meter on the side, and can detect the communication function of the 485 interface of the multifunctional energy meter
10. The device can achieve automatic calibration of mechanical meters through computer preset calibration schemes, complete calibration fully automatically, and issue testing reports
11. The device is equipped with standard high and low frequency power pulse output interfaces for standard energy meters, to facilitate the weekly inspection of the entire device
12. The device has fast protection and alarm functions, automatically protecting and alarming in case of voltage short circuit, current open circuit, or overload
13. The device supports barcode input to improve input efficiency (requires barcode scanner support)
14. It has manual operation function (requires support from Android system terminal - tablet or mobile phone)
15. Can be equipped with zero line current testing function (optional)
16. Can be equipped with a power consumption tester to achieve power consumption measurement function of the electric energy meter (optional)
17. Can be equipped with a multi serial communication system to achieve parallel communication between the computer and the tested meter (optional)
18. Can be equipped with tilt influence test (optional).

Product Usage
1. Verify the basic error (accuracy) of electromagnetic and electronic three-phase energy meters;
2. Verify the creep and starting errors of electromagnetic and electronic three-phase energy meters;
3. Verify the standard deviation and 24-hour variation of electromagnetic and electronic three-phase energy meters;
4. Verify the measurement errors and combination errors of electromagnetic and electronic three-phase energy meters;
5. Detect the changes caused by voltage, frequency, harmonics, reverse phase sequence, voltage imbalance and other influencing factors of electromagnetic and electronic three-phase energy meters;
6. Verify the constants of three-phase electric energy meters, both electric and electronic;
7. Check the power parameters of three-phase multifunctional energy meters and smart energy meters;

8. Check the daily timing error, time period switching error, and combination error of three-phase multifunctional energy meters and smart energy meters;
9. Detect the 485 communication interface of three-phase multifunctional energy meters and intelligent energy meters;
10. Detect the carrier communication interface of three-phase multifunctional energy meters and intelligent energy meters
.

Technical indicators
Instrument configuration details
1. Standard configuration details:
1) One three-phase programmable power source (linear source, 0.1 or 0.05 level optional)
2) One three-phase multifunctional standard energy meter (0.05 level)
i. Factory inspection report
Ii. Manual 1 volume
Iii. One copy of certificate of conformity
Iv. One aluminum alloy box
v. 1 high-frequency test line
Vi. One power cord
3) Isolation current transformer (configured by meter number)
4) 1 test meter rack (hanging meter rack)
5) One set of error handling system (embedded)
6) 485 communication detection interface (embedded)
7) 1 set of time-based frequency meter
8) 1 set of current testing wire (not included when configuring convenient junction boxes)
9) 1 set of voltage testing line (excluding intelligent devices)
10) 1 pulse signal line (excluding intelligent devices)
11) 1 data communication cable
12) 1 power cord for the device (standard three-phase four wire T4-25A plug)
13) One set of operation and data processing system for electric energy meter calibration device (ICT version)
14) 1 computer (domestic mainstream brand, specifications)
15) 1 printer (domestic mainstream brand, specifications)
16) 1 manual (including 1 operation manual, 1 simple maintenance manual, and 1 electronic version)
17) 1 copy of factory test report
18) 1 certificate of conformity
19) 1 copy of packing list
20) Packaging method: inner paper and outer wooden box (rainproof)
21) Transportation mode: Automobile transportation
22) On site installation and debugging training (3 days/time, including two sets of installation reports)

2. Select configuration details:
1) 1 manual keyboard (tablet)
2) Photoelectric sampler (domestically produced, matched according to the meter position)
3) 1 set of computer desk and chair (domestic)
4) Barcode scanner gun (domestic)
5) Multi winding isolation PT (for compatibility with single-phase energy meter calibration) 6) Multi port hub (domestically produced, specifications determined by meter digits)
7) 1 power consumption tester (domestic)
8) GPS signal antenna (line length 30 meters)
Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!