Wuhan Huatian Power Automation Co., Ltd
Home>Products>Secondary testing equipment for decoration testing
Secondary testing equipment for decoration testing
Provide free selection and technical solutions for installation, maintenance, and testing services. Provide a list of qualified electrical equipment f
Product details

brief introductionBrief Introduction

The latest Measures for the Administration of License for Installation (Repair, Testing) of Electric Power Facilities will come into effect on October 11, 2020. The "Measures for the Administration of License for Installation (Repair, Testing) of Power Facilities" (Order No. 28 of the State Electricity Regulatory Commission) announced by the former State Electricity Regulatory Commission on December 18, 2009, are hereby abolished. Huatian Power provides a brief introduction to the new version of the construction equipment selection guide required for the second level power facility license for installation (repair, testing).

Obtaining a second level installation (repair, testing) license, one can engage in the installation, maintenance, or testing activities of power facilities with voltage levels below 330 kV.

To learn about the application materials and filling specifications for the installation, maintenance, and testing of power facility licenses, you can click on "Application Specifications" to browse.

Alternative names: Secondary Testing Instruments, Secondary Testing Equipment, Testing Instruments and Equipment, Secondary Testing Configuration Table, Secondary Testing Equipment, Secondary Testing Equipment Selection Table

configuration tableConfiguration Table

Test Level 2 Configuration Table

Serial Number Name of machinery and equipment unit quantity specifications Specification and model
one High voltage generating equipment
1 DC high voltage generator cover 1 DC:250kV/5mA ZGF-250kV/5mA
2 Power frequency withstand voltage test device cover 1 AC:10kVA/100kV GSB-10kVA/100kV
cover 1 AC:5kVA/50kV YDJ-5kVA/50kV
3 Complete set of equipment for frequency conversion series resonance test cover 1 2000kVA/400kV/5A
30~300Hz
HTXZ-2000kVA/400kV
4 Induction voltage withstand test device cover 1 5kVA/360V
150Hz
SBF-5kVA/500V
two Electrical measuring instruments
1 High voltage dielectric loss tester tower 2 1. The accuracy of medium measurement is 1%
2. The capacitance accuracy is 0.5%
3. Anti interference frequency conversion
HTJS-V
2 Loop resistance tester tower 2 DC:≥100A HTHL-100A
3 Transformer volt ampere characteristic tester tower 1 2200V/5A HTFA-105
4 Ground Resistance Tester tower 1 Frequency difference method HTDW-5A
5 Capacitance and inductance tester tower 1 HTRG-H
6 Grounding continuity tester tower 1 DC:1A HTDT-10A
7 Transformer DC resistance tester tower 2 DC:≥10A HTZZ-10A
8 Transformer ratio tester tower 1 Digital 0.5 level HTBC-H
9 Transformer winding deformation tester tower 1 Frequency response method HTBX-H
10 Load tap changer tester tower 1 I≧1A HTBYC-3000
11 Circuit breaker characteristic tester tower 2 HTGK-III
12 Zinc oxide lightning arrester resistive current tester tower 1 HTYB-3H
13 Three phase relay protection tester tower 2 Two sets of three-phase voltage and current each HT-1200
14 Transmission line parameter tester tower 1 Frequency difference method HTXL-Y
15 Lightning strike counter calibrator only 1 HTFZ-III
16 insulation resistance tester tower 2 DC:0~5000V 200G(Ω)
Short circuit current ≥ 5mA
GM-5kV
three Oil and gas testing instruments
1 SF6 leak detector tower 1 Sensitivity 1ppmv XP-1A
2 SF6 gas micro water tester tower 1 HTWS-V
3 SF6 gas density calibrator tower 1 Accuracy level 0.2
Pressure range 0~1.0Mpa
HTMD-H
4 Insulation oil chromatograph tower 1 HTYSP-H
5 Insulation oil closed flash point tester tower 1 HTYBS-H
6 Insulation oil micro water meter tower 1 PPM level HTYWS-H
7 Insulation oleic acid value tester tower 1 HTYSZ-H
8 Insulation oil pH tester tower 1
9 Automatic dielectric loss measuring instrument for insulating oil tower 1 HTYJS-H
10 Insulation oil dielectric strength tester tower 1 HTJY-80B
four Common instruments and meters
1 Megger only 2 DC:2500V HT2671
2 Megger only 2 DC:500V HT2670
3 Digital dual clamp phase voltmeter only 2 Measure current 1mA~5A SMG2000B
Note:

1. All national users who purchase our products enjoy free technical guidance, software upgrades, one-year warranty, and lifelong maintenance services.

2. To learn more about Huatian products, please enter the product center. Service Hotline: 400-8855-448

qualifiedQualified

  • Those who have obtained the license for the installation (repair, testing) of second level testing power facilities can engage in testing activities for power facilities with voltage levels below 330kV. The applicant shall meet the following conditions:

  • 1、 Net assets

  • Having net assets suitable for carrying out installation (repair, testing) of power facilities, with a proportion of no less than 15% of the total assets.

  • 2、 Technical Manager, Safety Manager

  • Applicants for first to third level licenses must have at least 5 years of experience in the installation, maintenance, or testing management of power facilities that are suitable for the type of license being applied for, and hold intermediate or higher professional titles in power related fields; Those who apply for a first level license should have a senior professional title in the field of electricity.

  • 3、 Professional technical and skilled personnel

  • For those applying for first to third level licenses, there shall be no less than 50, 30, and 15 professional and technical personnel in the field of electric power, among whom no less than 30, 15, and 5 have intermediate or above technical qualifications respectively; There shall be no less than 60, 30, and 20 professionals with specialized skills in the field of electricity, including no less than 30, 15, and 10 high-voltage electricians.

  • 4、 For those applying for Level 1 to Level 3 licenses, in addition to meeting the above conditions, they should also have the following performance that is suitable for the category and level of the license being applied for:

  • 1. For those applying for Level 1 to Level 3 installation permits, they should have a track record of engaging in the installation of transformer (distribution) and line facilities with voltage levels below 330 (220) kV, 110 (66) kV, and 35 kV and above, respectively, within the past three years, and the quality should be qualified; During this period, the highest annual engineering settlement income engaged in power facility installation business shall not be less than 200 million yuan, 100 million yuan, and 30 million yuan, respectively.

  • 2. For those applying for Level 1 to Level 3 maintenance or testing licenses, they should have a track record of engaging in maintenance or testing activities for transformer (distribution) and line facilities with voltage levels below 330 (220) kV, 110 (66) kV, and 35 kV and above, respectively, in the past two years.

Product FeaturesProduct Characteristics

Product videoProduct Video

Instrument AtlasInstrument Pictures

(Secondary testing instrument) High voltage generating equipment

DC high voltage generator

10kVA/100kV power frequency withstand voltage test device

5kVA/50kV power frequency withstand voltage test device

Complete set of equipment for frequency conversion series resonance test

Induction voltage withstand test device

(Secondary testing instrument) Electrical measuring instrument

High voltage dielectric loss tester

Loop resistance tester

Transformer volt ampere characteristic tester

Ground Resistance Tester

Capacitance and inductance tester

Grounding continuity tester

Transformer DC resistance tester

Transformer ratio tester

Transformer winding deformation tester

Load tap changer tester

Circuit breaker characteristic tester

Zinc oxide lightning arrester resistive current tester

Three phase relay protection tester

Transmission line parameter tester

Lightning strike counter calibrator

insulation resistance tester

(Secondary testing instrument) Oil and gas testing instrument

SF6 leak detector

SF6 gas micro water tester

SF6 gas density calibrator

Insulation oil chromatograph

Insulation oil closed flash point tester

Insulation oil micro water meter

Insulation oleic acid value tester

Automatic dielectric loss measuring instrument for insulating oil

Insulation oil dielectric strength tester

(Secondary testing equipment) Common instruments and meters

2500V megohmmeter

500V megohmmeter

Digital dual clamp phase voltmeter

product certificateProduct Certificate

Our company's products are strictly produced in accordance with international and national standards and industry regulations. They have passed the testing of national, provincial, and municipal power research institutes, measurement centers, and authoritative power departments, and have fully passed the ISO9001 international quality management system certification, the People's Republic of China manufacturing measuring instrument license, GB/T19001-2016 quality management system requirements, GB/T24001-2016 environmental management system requirements, and GB/T45001-2020 occupational health and safety management system requirements.

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!