Jiangyin Shangdeli Machinery Co., Ltd
Home>Products>SDL efficient wet mixing process
SDL efficient wet mixing process
SDL efficient wet mixing process
Product details


GHL series efficient wet mixing granulator:
This machine adopts a horizontal cylindrical structure with a reasonable structure. Inflatable sealed drive shaft, can be switched to water during cleaning. Fluidized granulation results in approximately spherical particles with good flowability. Reduce adhesive by 25% compared to traditional processes and shorten drying time. Dry mix for 2 minutes each time, pelletize for 1-4 minutes, and the efficiency is 4-5 times higher than traditional processes. Completed in the same closed container, dry mixing wet mixing granulation, process reduction, in compliance with GMP standards. The entire operation has strict safety protection measures.

Working principle of high-efficiency wet mixing granulator:

This machine adopts a horizontal cylindrical structure with a reasonable structure. Fully seal the drive shaft and switch to water during cleaning. Fluidized granulation results in approximately spherical particles with good flowability. Reduce adhesive by 25% compared to traditional processes and shorten drying time. Dry mix for 2 minutes per batch, pelletize

1-4 minutes, the efficiency is 4-5 times higher than traditional processes. Completed in the same closed container, with dry mixing, wet mixing, and granulation, reducing the process and complying with GMP standards. The entire operation has strict safety protection measures.


[Technical Parameters]:

model 10 50 150 200 250 300 400 600
Volume (L) 10 50 150 200 250 300 400 600
Output (kg/batch) 3 15 50 80 100 130 200 280
Mixing speed (r/min) 300/600 200/400 180/270 180/270 180/270 140/220 106/155 80/120
Hybrid power (kw) 1.5/2.2 4/5.5 65/8 9/11 9/11 13/16 18.5/22 22/30
Cutting speed (r.p.m.) 1500/3000 1500/3000 1500/3000 1500/3000 1500/3000 1500/3000 1500/3000 1500/3000
Cutting power (kw) 0.85/1.1 1.3/1.8 2.4/3 4.5/5.5 4.5/5.5 4.5/5.5 6.5/8 9/11

[Service Commitment]:

Design and production
Our company extensively solicits opinions from the demand side during the design and production stages of equipment processing, especially in the layout of flat and vertical surfaces, fully considering the site conditions and public engineering conditions of the demand side, so as to ensure the quality of the equipment while optimizing the combination.
Installation and commissioning
When the equipment arrives at the buyer's factory, our company will send dedicated technical personnel to guide the installation and be responsible for debugging to normal use.
training
Before the equipment is used normally by the demand side, our company's debugging personnel will organize training for relevant personnel of the demand side. The training content includes equipment maintenance, upkeep, timely repair of common faults, and operating procedures for the equipment.
quality assurance
Our company's equipment warranty period is one year. During the warranty period, if the equipment is damaged due to non-human factors, we are responsible for free maintenance. If the equipment is damaged due to human factors, our company will promptly repair it and charge a cost fee.
Maintenance and Deadline
Equipment damage that occurs upon expiration of the warranty period shall be repaired on site within two days by enterprises within the province and within four days by enterprises outside the province upon receiving notification from the purchaser. The services provided upon expiration of the warranty period are paid services, and a production fee shall be charged for each service.
Service Commitment
Our company promises to provide lifelong guidance, maintenance, and service for all equipment.
Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!