Beijing Yitesen Environmental Engineering Co., Ltd
Home>Products>Glove production chlorine supply setting
Product Groups
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    13321150999
  • Address
    Room 802, Sunshine Wealth Building, No. 63 Xidawang Road, Chaoyang District, Beijing
Contact Now
Glove production chlorine supply setting
The detailed explanation of the chlorination system is that it operates under vacuum. The complete chlorination system includes: chlorine gas source s
Product details

detailed description

The chlorination system operates under vacuum, and the complete chlorination system includes: Chlorine gas source supply system,Chlorine gas metering and dosing system,Detection and control system,safety protection system reachattachment.

The complete chlorination system (from the outlet of the vacuum regulator to the inlet of the water injector) operates under vacuum with the help of a vacuum suction water injector. Vacuum transfer to the chlorination machine, and then through the pipeline to the vacuum regulator.

This system consists of a chlorine gas cylinder group as the chlorine source, which can be provided by connecting the chlorine gas outlet of the chlorine cylinder.

Gas chlorine is produced by a chlorine cylinder gas valve, passing through a manifold and pipeline, relying on its own pressure to first pass through a chlorine gas filter to remove impurities from the chlorine gas, ensuring that clean chlorine gas enters the subsequent equipment.

The filtered chlorine gas is transported through the pipeline and enters the pressure reducing shut-off valve of the vacuum regulator by its own pressure for primary pressure reduction.

The chlorine gas, which has undergone a first stage pressure reduction, continues to enter the second stage pressure relief valve of the vacuum regulator. The diaphragm in this valve senses vacuum on one side and atmospheric pressure on the other side. Due to the pressure difference on both sides, a spring valve is forced to open. This ensures that the pressure gas is reduced to a vacuum state and then transported to the chlorination machine through the pipeline.

Chlorine gas is transported through pipelines in a vacuum state and enters the control unit of the chlorination machine. The flow rate of chlorine gas is visually displayed through the glass rotor flowmeter of the chlorinating machine, and is also monitored by the chlorinating machineVThe different opening degrees of the slotted chlorine gas flow control valve regulate the chlorine gas flow rate. Cooperate with the chlorination machineVThe use of a slotted chlorine gas flow control valve.

Then chlorine gas is transported to the water injector through pipelines. The metered chlorine gas is mixed with water in the water injector. Then, the chlorine aqueous solution is transported to the chlorine washing tank by its own pressure.
Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!