1. purpose.Characteristics and scope of adaptation
DTSY/DSSY6607-DSeries plug-in card public three-phase fully electronic prepaid energy meter series. Our company adopts imported specialized large-scale integrated circuits, 16 bitsA/DConversion, digital multiplier, application of digital sampling processing technology, and data acquisition, processing, storage, and application by advanced microcontroller processing systemsSMTA new type of instrument for process manufacturing. Suitable for measuring rated frequencies of50Hzperhaps60HzThe consumption of active electrical energy in a three-phase three wire or three-phase four wire AC power grid. The product complies withGB/T17215.321-2008《1Level and2Static AC Active Energy Meter andGB/T 18460.3-2001《ICCard prepaid electricity sales system3Part: All technical requirements for prepaid energy meters.
Main features:
1Apply computer management to purchase electricity before using it; Can be limited within the rated current rangeMaximum operating power (limited by the power supply department);
2The first time the card is inserted, there is power, and the second time the card is inserted, the power is retrieved to prevent the user's card from being stolen or lost.
3When the battery level is not retrieved or forgotten to be retrieved, the battery level will be automatically stored in the meter after the set time. As long as there is no user using the meter, the battery level can be retrieved at any time, up to a maximum storage capacity99Household.
4Optional RF function, using non-contact card to enhance the service life of the card.
This table is designed for fixed installation indoors and is suitable for environments with temperatures not exceeding-20~+55℃, relative humidity not exceeding85%And the air does not contain corrosive gases and should avoid the influence of dust, mold, insects, etc.
2. Specifications, models, and technical indicators
2.1Specification and model
model |
accuracy class level |
reference voltage Un |
Rated current Ib |
Access method |
instrument constant imp/kWh |
DTSY6607 DSSY6607 |
1perhaps2 |
3X220/380 3X380V |
1.5(6) |
Mutual inductance type |
1600 |
5(20) |
direct-type |
800 |
|||
10(40) |
direct-type |
400 |
|||
15(60) |
direct-type |
400 |
|||
20(80) |
direct-type |
400 |
2.2Basic Error (Balance Load Error Limit)
current |
Power factor (COSφ) |
Basic error(%) |
||
Directly connect the instrument panel |
Transformer instrument |
1 |
2 |
|
0.05Ib≦I<0.1Ib |
0.02Ib≦I<0.05In |
1 |
±1.5 |
±2.5 |
0.1Ib≦I<>< span=""><> |
0.05In≦I<>< span=""><> |
1 |
±1.0 |
±2.0 |
0.1Ib≦I<0.2Ib |
0.05In≦I<0.1In |
0.5(Sensory) 0.8(Capacity) |
±1.5 |
±2.5 |
0.2Ib≦I<>< span=""><> |
0.1In≦I<>< span=""><> |
0.5(Sensory) 0.8(Capacity) |
±1.0 |
±2.0 |
Note: (IbRated currentImaxMaximum current
2.3start
At reference voltage, reference frequency, andCOSφ=1.0Under the condition of, the load current is0.004Ib(1level)、0.005Ib(2level)The instrument should be able to continuously measure electricity.
2.4shunt running
Voltage circuit with rated voltage115%When there is no current in the current circuit, the test output of the instrument should not generate more than one pulse.
2.5Voltage range
Normal operating voltage:0.9Un-1.1UnMaximum operating voltage:0.8Un-1.15Un
2.6power consumption
Voltage line power consumption: ≤2Wand10VACurrent line power consumption: ≤4.0VA
3.Working principle
3.1Working principle block diagram
The electric energy meter obtains voltage sampling signals from the voltage divider, current sampling signals from the current transformer, voltage current product signals from the multiplier, and then generates a counting pulse with frequency proportional to the product of voltage and current through frequency conversion.
3.2data processing
Electric energy metering pulses are sent through a photoelectric couplerCPUProcessed and stored in non-volatile storage after computationEEPROMIn the middle. Managed by a computer information system, throughICCard reader/writer, capable of writing a certain amount of power and monitoring requirementsICThe microprocessor system in the card input table, throughCPUAfter calculation, provide display, alarm, and cut-off status signals.
4.Installment and use
4.1 The electric energy meter can be installed and used after passing the inspection and being sealed with a lead seal before leaving the factory. Electric energy meters without lead seals or stored for too long should be re inspected by relevant departments before installation and use.
4.2The electric energy meter should be installed in a ventilated and dry indoor area, and can be installed at any position, but it is usually installed vertically. It is recommended to install it at a height of1.8The base plate for installing the electric energy meter should be fixed on a sturdy, fire-resistant, and vibration resistant wall.
4.3In places with pollution and potential damage to the structure, the energy meter should be installed in a protective cabinet.
4.4When installing wiring, follow the wiring diagram on the terminal cover of the electric energy meter or the corresponding wiring diagram in this manual. It is best to use copper connectors to prevent the electric energy meter from burning out due to poor contact.
4.5When using an electric energy meter in areas with frequent lightning strikes, lightning protection measures should be taken to avoid damaging the meter due to lightning strikes.
4.6The load capacity of an electric energy meter is0.05Ib~Imax(Direct access type) or0.02Ib~ImaxExceeding this load capacity between (connected through transformers) will result in inaccurate measurement of the energy meter or burning of the current coil due to heating.
4.7The reading of an electric energy meter connected through a transformer must be multiplied by the transformation ratio to obtain the actual amount of electricity.
4.8 After installing the table, use the settings card to set the table to the cost system table. Once successfully set up, the table belongs to the system and cannot be recognized by other systems.
4.9 After successful setting, the user can use the account opening card (on the authorized table). The first time the card is inserted, the battery level will automatically enter the table, and the battery level will be retrieved when the card is inserted again.
4.10 The power card function retrieves the stored power and reads it back into the system. Perform final processing.(To be increased)
4.11The meter reading card can read back the electricity in the meter, and each card can read248The total electricity consumption of the block meter. (To be added)
4.12Using one table with multiple cards: held by usersICThe card should be properly stored. If lost, the card should be replaced but the battery should not be replenished. The replacement card can be used to retrieve the battery.
4.13 The interval between each card insertion is10In seconds. Less and less10The second meter does not recognize. The RF card must display a success symbol before it can be removed to prevent battery loss.
4.14Preparation for purchasing electricity: Users bring their cards directly to the computer management office to purchase electricity.
4.15Electricity purchase method: When selling electricity, theICCard insertionICCard reader/writer, simultaneously operating the computer to encrypt and write user ID, pre ordered power, capacity limit method, and power limit, etcICCard.
4.16Electricity card usage: Insert the power purchase card into the card slot. If it is a valid power purchase card, the meter will automatically read the data into the meter. After waiting for a while, turn off the switch light to supply power. After use, please insert the card again to retrieve the battery and store it properly.
4.17Operation display: During the operation of the electric energy meter, the display screen shows
The remaining electricity in the table, total electricity consumption, and meter constant information.
Before operating the electricity meter, it is necessary to enter the system and record the meter number, meter constant, and other information for meter reading purposes.
6.4.19 The electricity meter should be loaded after it is fully closed, as direct loading will result in the lifespan of the relay.
5.Functional terminal wiring

External dimensions
8. Visual explanation
C-01: Initialization card C-02: Purchase power card C-03: Check power card
C-04: Purchase power card replacement card C-05: Set up card C-06: Get power card
C-07: Withdrawal card C-08: Preset card C-09: Test card
C-0B: Meter Reading Card C-0C: Parameter Modification Card C-0D: Constant Card
C-0E: School watch card C-15: Factory setting card C-16: Factory reset card
C-19: Factory Test Card C-1A: Customer Number Card
8. 1 Error codeError=01Card data error;Error=02
Card data verification error;Error=03System identification error;Error=04
: Non system card;Error=05Card data error;Error=06
Card data verification error;Error=07: Reserved;Error=08
Inserting an invalid card while using electricity;Error=09Illegal card;Error=0A
The electricity meter has not been set up for account opening;Error=0BThe card password is incorrect;Error=0C
: Reserved;Error=0D: Region error;Error=0E
Error in writing back card;Error=0FError in writing back card;Error=10
When taking power, insert a non local user card;Error=11Error in writing back card;Error=140The reset count has been reached
;Error=55Error reading card data;Error=FF
The electricity meter is not registeredError=12
The customer number in the card setting is incorrect and cannot be set;Error=13
The electricity meter has already been set up and cannot be reset
9.1 9. Transportation and StorageThe transportation and unpacking of electric energy meters should not be subjected to severe impacts, and should be carried out according toGB/15464-1995
9.2 The General Technical Conditions for Instrument Packaging stipulate transportation and storage.-30The electric energy meter should be stored in its original packaging box at an ambient temperature of65℃~+℃, relative humidity not exceeding85%
8.3And there should be no gas in the air that can cause corrosion, and the ambient temperature should not change dramatically.The electric energy meter should be placed on the rack in its original packaging condition, with a stacking height of no more than five boxes. After unpacking, the stacking height of a single packaged electric energy meter should not exceed five boxes, with an inner packaging(plastic bag)
The unsealed energy meter should not be stored.
10. Warranty period18From the date of manufacture of the electric energy meter