1、 Product Overview

As the name suggests, high and low voltage distribution cabinets are distribution equipment used in power supply systems for energy distribution, control, metering, and cable connection. Generally, power supply bureaus and substations use high voltage switchgear,
Then, the low-voltage side of the transformer is stepped down and led out to the low-voltage distribution cabinet. The low-voltage distribution cabinet is connected to various power distribution panels, control boxes, and switch boxes. Inside, some switches, circuit breakers, fuses
A power distribution device that integrates protective devices such as buttons, indicator lights, instruments, and wires to meet the design functional requirements. Commonly known as high and low voltage switchgear or complete sets of high and low voltage electrical equipment.


2、 Model and meaning


3、 Normal usage conditions

1. The altitude shall not exceed 1000m.

2. Environmental temperature: -25 ℃~400 ℃.

3. Relative humidity: The daily average is not greater than 95%, and the monthly average is not greater than 90%.

4. Installation location: A place without fire, explosion hazards, conductive dust, corrosive chemical gases, and severe vibrations. If the above conditions are exceeded, users can negotiate with our company.


4、 Purpose:

This series is widely used in urban power grid renovation, residential communities, high-rise buildings, industrial and mining areas, hotels, shopping malls, airports, railways, oil fields, docks, highways, as well as temporary power facilities and other indoor and outdoor places.


5、 High voltage side

Intelligent integrated substations generally use load switch fuse combination electrical protection for high voltage. After one phase of the fuse is blown, the three phases are interlocked and tripped. The load switch can be selected from compressed air, vacuum, sulfur hexafluoride and other types, and can be operated by a power distribution mechanism to achieve automation upgrade. The fuse is a high voltage current limiting fuse with an impactor, which has reliable action and large breaking capacity. The main technical parameters are shown in the table below. For transformers above 800kVA, vacuum circuit breakers such as ZN12, ZN28, VS1 can be used for protection.


6、 Low voltage side

The low-voltage main switch adopts universal or intelligent circuit breakers for selective protection; The outgoing switch adopts a new type of plastic shell switch with small volume, short arcing, and up to 30 circuits; IntelligentThe automatic tracking reactive power compensation device has two switching modes for users to choose from: contactor and non-contact.


7、 Transformer

Intelligent integrated substations can use low loss, oil immersed, fully sealed S9, S10, S11 series transformers, or resin based onesInsulated or NOMEX paper insulated environmentally friendly dry-type transformers can be equipped with a trolley at the bottom for easy access.


8、 Execution standards

This product complies with the following standards: GB/T17467-2010 "High Voltage/Low Voltage Prefabricated Substations"
DL/T537-93 "Technical Conditions for Ordering 6-35kV Box type Substation"


9、 Technical parameters

Technical parameters of load switch

Serial Number name unit FN12-12 load switch FZN25-12 vacuum load switch
1 rated voltage kV 10
2 maximum working voltage kV 12
3 Rated frequency Hz 50
4 Rated current A 630
5 Rated breaking load current A 630
6 Thermal stability current (effective value) kA/S 20/2 20/4
7 Dynamic stable current kA 50 50
8 Short circuit closing current (peak value) kA
50 50
9 Number of full load disconnections order 20 10000
10 mechanical life order
2000 10000
11 1-minute power frequency withstand voltage (phase to phase and ground) kV
42 42
12 Lightning impulse voltage (phase to ground) kV 75 75

Technical parameters of high-voltage fuses

Serial Number

rated voltage

(kV

Rated current

(A

Breaking current

(KA

Rated current of melt

(A

UK model Domestic models
SDL※MZ
12 40 31.5 6.3,10,16,20,25,31.5,40
SFL※MZ
XRNT-12 12 100 31.5 50,63,71,80,100
SKL※MZ

12 125 31.5 25
Note: Determine whether the impactor is installed, where N is without a striker and A is with a striker

Technical parameters of low-voltage circuit breaker
model Release form Rated current of release device (A) Switching ability KA (AC380V)
DW15-630 Thermal electromagnetic type 315,400,630 40
DW15-1000 Or electronic type 630,800,1000 50
DW15-1600
1600 50
DW15-2500
1600,2000,2500 60
CW1-2000 Intelligent
630,800,1000,1250,1600,2000 65(80)
CW1-3200 2000,2500,3200 100

10、 Performance parameters


project unit parameter

tall

press

one

first

Rated frequency Hz 50
rated voltage kV 6 10 35
maximum working voltage kV 6.9 11.5 40.5
Rated current A 400, 630, 1250
transfer current A 1200-3150
Power frequency withstand voltage to ground and phase to phase/isolationfracture surface kV 42/48
Lightning impulse withstand voltage to ground and phase to phase/isolationfracture surface kV 75/85
Rated short-circuit breaking current (current limiting fuse) kA 31.5

become different

press

implement

one

first

rated voltage kV 6. 10, 35
Rated capacitance kVA 30-2000
tapping range % ±22.5%±5
Connecting groups
Yyn0、Dyn11
Impedance Voltage % 4. 4.5, 6, 8
Low voltage unit
rated voltage V 220, 380, 690, 800
Rated current of main circuit A 50-4000
Branch Current A 5-8000
casing
Protection level (conventional products)
High voltage chamber IP33; Transformer room IP23; Low voltage room IP33
noise level dB ≤50


11、 Installation, use and maintenance

In addition to the various regulations required by the Ministry of Electric Power for installation, acceptance, handover testing, operation, and maintenance of intelligent integrated substations, the following matters should also be noted:
1). Users should carefully inspect the goods according to relevant regulations when receiving them. For products that are not installed immediately, they should be stored in appropriate places according to normal usage conditions.
2) The product should be lifted from the bottom using specialized lifting equipment.
3) The product is horizontally placed on a pre made foundation, and then the gap between the product base and the foundation is sealed with cement mortar to prevent rainwater from entering the cable room. It enters through the bottom sealing plate of the high and low voltage rooms
High and low voltage cables.
4). After the product is installed in place, reliable grounding should be done; The two main grounding terminals on the channel steel of the power station base, the neutral point and shell of the transformer, and the lower pile head of the lightning arrester should all have installed grounding, and all grounding should be installed separately
A set of grounding devices should be shared, with a grounding resistance of less than 4 ohms. The grounding leads from the grounding grid to this product should be less than 2.
5). After installation or maintenance, the product should undergo the following inspections and tests before being put into operation:
(1) Is the substation clean;
(2) Is the operating mechanism flexible
(3) Whether the on/off of the main electrical appliances is flexible and reliable;
(4) Is the electrical auxiliary contact reliably prepared for on/off;
(5) Whether the meter and relay actions are accurate and correct;
(6) Whether the changes and wiring polarity of instruments and transformers are correct;
(7) Are all electrical installation nuts tightened and installed securely and reliably;
(8) Whether the busbar connection is good, and whether the supporting insulators and clamps are installed reliably;
(9) Whether the setting value of the electrical appliance meets the requirements and whether the specifications of the fuse core are correct;
(10) Whether the contacts of the main circuit and auxiliary circuit meet the requirements of the electrical schematic diagram.
6). maintenance
(1) All components in the product are maintained according to their respective technical requirements;
(2) If the selected transformer is oil immersed, oil sample analysis and inspection should be conducted at least once a year according to specifications;
(3) After 20 times of on load or 2000 times of off load opening and closing operations, the contact condition and the degree of loss of the arc extinguishing device should be checked for high-voltage switching equipment in operation. If any abnormalities are found, they should be repaired or replaced immediately.
(4) The reason for the automatic tripping of low-voltage switchgear must be resolved before it can be put back into operation;
(5) A preventive test should be conducted before the rainy season each year
The product comes with a packing list, certificate of conformity, installation and use instructions, electrical wiring diagram, and instructions for the main components and equipment used in this product, as well as key operation tools and spare parts provided according to the agreement.


12、 Substation Layout Plan




13、 Ordering Notice

The parameters in this plan are the standard configuration provided by our company. If the customer has no specific requirements, the company will supply according to the standard configuration. If it exceeds the requirements of this plan, please explain separately.
Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!